• page_banner

Product

S355J2H/S355JO/S355J2/S275JOH Seamless/ERW Square Rectangular hollow section Steel Tube

Square tube uses are construction, machinery manufacturing, steel construction projects, shipbuilding, solar power generation support, steel structure engineering, electricity

Square tubular products square tubular products

Power engineering, power plant, agricultural and chemical machinery, glass curtain wall, automobile chassis, airport boiler construction, highway railings, housing construction, pressure vessels, oil storage tanks, Bridges, power plant equipment, lifting and transportation machinery and other high load welded structures, etc

classification

Folding process classification

According to the production process, the square tube is divided into hot rolled seamless square tube, cold drawn seamless square tube, extruded seamless square tube and welded square tube.


Product Detail

Product Tags

Product description

We are experienced manufacturer. Wining the majority from the crucial certifications of its market for Excellent quality China S355j2h/S355jo/S355j2/S275joh Seamless/ERW Square Rectangular Hollow Section Steel Tube, We sincerely welcome buyers from both at your house and overseas to arrive to barter organization with us.

Excellent quality China Hollow Section,  Rectangular Pipe, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we are going to earnestly supply qualified solutions and good service for domestic and international customers.

3

S355j2h/S355jo/S355j2/S275joh products with accurate size, stable performance are widely used in large steel structure engineering, bridge construction, airport construction, shipbuilding, tower crane, machinery manufacturing and other fields..

abide by the contract", conforms on the market requirement, joins from the market competition by its good quality likewise as provides more comprehensive and superb support for customers to let them become large winner. The pursue of the company, is definitely the clients' pleasure for Factory Outlets China European En Standard S355j2h/S355jo/S355j2/S275joh products with accurate size, stable performance are widely used in large steel structure engineering, bridge construction, airport construction, shipbuilding, tower crane, machinery manufacturing and other fields.

abide by the contract", conforms on the market requirement, joins from the market competition by its good quality likewise as provides more comprehensive and superb support for customers to let them become large winner. The pursue of the company, is definitely the clients' pleasure for Factory Outlets China European En Standard S355j2h/S355jo/S355j2/S275joh Rolled Rectangular Steel Ube, Our enterprise is dedicated to providing prospects with superior and stable top quality items at competitive selling price, producing each and every customer content with our services and products.

Factory Outlets China Shs,  Hollow Section, Our company mission is that providing high quality and beautiful items with reasonable price and strive to gain 100% good reputation from our clients. We believe Profession achieves excellence! We welcome you to cooperate with us and grow up togethe

 Hot Rolled Rectangular Steel Ube, Our enterprise is dedicated to providing prospects with superior and stable top quality items at competitive selling price, producing each and every customer content with our services and products.

Factory Outlets China Shs,  Hollow Section, Our company mission is that providing high quality and beautiful items with reasonable price and strive to gain 100% good reputation from our clients. We believe Profession achieves excellence! We welcome you to cooperate with us and grow up togethe

Quick Details

Place of Origin Shandong, China
Application Structure Pipe
Alloy Or Not Non-Alloy
Section Shape Round
Special Pipe Thick Wall Pipe
Outer Diameter 10 - 600 mm
Thickness 1.24 - 60 mm
Standard ASTM, bs, DIN, GB, JIS, ASTM A106-2006, ASTM A53-2007, ASME B36.10M-2004, ASME B36.19M-1985, BS 1387, BS 1139, BS EN10025, BS 31, DIN 1626, DIN 1629/3, SEW680, DIN 17175, GB/T8162, Gb/t8163, JIS G3456-2004
Grade 45#, 16mn, A53(A,B), A106(B,C), 10CRMO910, 13CrMo44, Cr2Mo, 15MnV, 15Mo3, 16Mo3, Q235, Q345, ST52, St37-2, ST54, 10#-45#, 16mn, A53-A369, Cr-Mo alloy, Mn-V alloy, MO, Q195-Q345, ST35-ST52
Surface Treatment black painting/oiled/galvanized etc
Tolerance ±1%
Processing Service Bending, Welding, Decoiling, Punching, Cutting
Secondary Or Not Non-secondary
package in bundles or in wooden case
Product name S355J2/S275JOH Seamless/ERW Square Rectangular hollow Steel Tube
Length 6m-12m
Technique Hot Rolled
Certification ce
Type Square Tubes
Supply Ability 2000000 Ton/Tons per Month

Packaging & Delivery

ee74e9e0c7a5d63704bed2bc9664031

Packaging Details

in bundles or in wooden case

Port

Qingdao/tianjin/shanghai

Lead Time:

Quantity(Tons)

1 - 200

>200

Est. Time(days)

7

To be negotiated

Shape Round pipe Square pipe Rectangular pipe
Outer diameter 16-720mm 15*15-600*600mm 10*20-600*800mm
Wall thickness 0.2-30mm  0.6-30mm 0.6-30mm
Length 2m--5.8m/6m/12m and RANDOM LENGTH
Standard ASTM,BS1387-1985,GB/T3091-2008,DIN2440,JIS-G3444,EN10255

Zinc coating

Pre galvanized: 60-150g/m2;

Hot dipped galvanized: 270-400g/m2

Inspection With hydraulic testing,eddy current and infrared test
Packing In bundles, also then packed in woven bag.
Delivery time Less than 20days
Payment Terms T/T or L/C

Our Services

2

1. Free sample can be supplied

2. Trial order  is acceptable

3. Third party test is acceptable

4. Delivery time guarantee

2
1

Products Show

3 (8)
3 (6)
3 (5)

FAQ

--1. Q: What is your MOQ(minimum order quantity)?

A: Only One Piece

--2. Q: What is your packing methods?

A: Packed in bundle or bundle with plastic bag or bulk.

--3. Q: What is your payment terms?

A: T/T 30% in advance by T/T, 70% will be before shipment under FOB.

    T/T 30% in advance by T/T, 70% against the copy of BL under CIF.

    T/T 30% in advance by T/T, 70% LC at sight under CIF.

    100% LC at sight CIF.

--4. Q: What is your delivery time?

A: Usually 15-20 days after received the advance payment, also depends on quantity.

--5. Q: Can we visit your factory?

A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

Buyer Reviews

7

Project case

4

1. 2015 Kuwait airport construction

2.2017 Singapore tunnel project construction

3. Curtain wall project of Hong Kong Government in 2010

4.2020 London GRG project construction

5. Steel structure construction project of Liaocheng Cultural Square

6. Liaocheng gymnasium construction project

7. 5g signal tower in 2020

8. Steel structure construction in Singapore in 2020

6
5

  • Previous:
  • Next:

  • Write your message here and send it to us